,

Semi-Portal Cranes

The ABUS half-port cable EHPK is particularly suitable for the transport of goods up to 10 t on the middle transport level. Due to its characteristics, it fits seamlessly into existing material flow systems: the upper undercarriage moves on a conventional crane runway; No guide rails on the floor side are necessary on the lower undercarriage, so that no interfering edges are created. Only low loads are created on the hall design.

A combination of round light and obstacle detection ensures the required safety during the process of the half-port cable. From an economic point of view, the semi-portals are characterized by comparatively low investment costs and not least by a simple and fast installation.

  • Load capacity up to 10 t
  • Wingspan up to 15 m
  • Application on medium material flow plane
  • No stopping edge, since without guide rail on the ground
  • Quick and easy installation
  • Low static load for hall construction